Case Studies

Here are some examples of recent work for our clients.

Aldersbrook – Heating System Upgrade

20250522_090801

The works included the replacement of the existing boilers with 3 No new Condensing boilers complete with new flues and pumpsets.

Latton Bush Centre, Harlow

20250522_091626

The works included the provision of 6 No condensing boilers, complete with modulating pumpsets, cascade, primary side expansion, plate heat exchanger, new flues and secondary pumpsets with zone valves.

Lochinver House school – Toilet Refurbishment

Lochinver House2

The school commissioned the refurbishment of the school toilets. The existing facilities were outdated, non-compliant with accessibility standards, and prone to maintenance issues.

Southpark Phase 2 – Pipe work replacement

WhatsApp Image 2025-04-24 at 10.24.46_5558a580

The work included the provision full heating pipe-work replacement throughout the school including 62 No. new fan convectors and heat emitters according to the technical design specifications.

Nightingale School Phase 1

20250522_072554

The works included to provision of 2 No new condensing boilers, including flues, pumps, and all associated pipework and valves according to the technical design specifications.

Secondary School,
North London

ig4

The heating and hot water plant contained in the existing Main Building Boiler Room at the college was at the end of its useful life and was in need of complete replacement. SJP Mechanical Services Ltd were commissioned to upgrade the plant to modern energy efficient equipment.

High School,
Essex

2

The heating and hot water plant contained in the existing Boiler Room at the school was at the end of its useful life and was in need of complete replacement. SJP Mechanical Services Ltd were commissioned to upgrade the plant to modern energy efficient equipment.

London Fire Staion,
Heating Upgrade

firestation2

The heating and hot water plant was at the end of its economic working life and was in need of major upgrade to new, modern and efficient equipment. The works included the provision of two modular condensing boilers …

Office Block,
London

1a

The heating and hot water plant contained in the existing Boiler Room at the office block was at the end of its useful life and was in need of complete replacement.