London Borough of Redbridge – Pipe work replacement




The work included the provision full heating pipe-work replacement throughout the school including 62 No. new fan convectors and heat emitters according to the technical design specifications. Careful attention was paid to ensure optimal performance, efficiency, and compliance with industry standards.
The complete installation was commissioned, regulated and handed over to the school in full operating order. The Contract was completed on time, within the agreed cost and contract period whilst the school was fully operational.





